{"passed":10,"total":10,"checks":[{"check":"unvalidated inundation extent fails closed","pass":true,"detail":""},{"check":"safe stop carries a next action","pass":true,"detail":""},{"check":"screening disclosure names what was not generated","pass":true,"detail":""},{"check":"empty quotation cannot support a claim","pass":true,"detail":""},{"check":"contained quotation supports a bounded claim","pass":true,"detail":""},{"check":"structured context starts within its bound","pass":true,"detail":""},{"check":"all public output is labelled draft","pass":true,"detail":""},{"check":"source conflict creates a targeted clarification","pass":true,"detail":""},{"check":"owner correction changes the draft with history","pass":true,"detail":""},{"check":"every rendered section exposes its evidence class","pass":true,"detail":""}],"disclosures":["Draft for owner, emergency manager, and state dam-safety review. It is not approved, certified, or submitted. It is not a substitute for jurisdiction-specific engineering judgment.","No inundation boundary has been generated. The displayed path is a documented flow-path input, not a flood extent, arrival-time estimate, evacuation zone, or engineering analysis."]}