Downstream Emergency planning, built together

The Collaborative Partner

A plan no owner should have to write alone.

Downstream combines public dam records, reviewable document facts, and the knowledge only an owner has. It asks one useful question at a time, remembers across sessions, and assembles a cited Emergency Action Plan draft for qualified review.

Boundary: this demo never generates an inundation boundary, evacuation zone, certification, or submission. It produces a synthetic draft and a documented safe stop.

The friction

The form is not the hard part.

Facts are scattered across public records, old drawings, local memory, and jurisdiction-specific guidance.

01 Discover

Resolve what is already known

Read the federal record and drawing evidence before asking the owner.

02 Ask

One question at a time

Capture practical knowledge in short sessions, with a reason for every question.

03 Adapt

Learn how this owner works

Plain language, vocabulary, detail level, and corrections change later interactions.

04 Review

Build a traceable draft

Every fact has provenance and regulatory text needs a contained source quote.

Measured multimodal evidence

The drawing was read, recorded, and graded.

One real Vertex AI Gemini 3.5 Flash response ships beside the image, truth, and accuracy report.

Synthetic 1958-style Cedar Hollow dam drawing with crest elevation, spillway, and embankment height labels
Gemini 3.5 Flash, recorded output

5 of 5 measured checks passed

3/3
target values matched adjacent truth
All
quotes occur in Gemini's own transcription
0
facts dropped by the guard

The drawing says 31 feet while the synthetic registry fixture says 28. Downstream keeps both and marks the conflict for owner review.

Inspect the recording, truth, and score

Interactive judge preset

Build the draft with Cedar Hollow.

A synthetic dam keeps the workflow testable without making claims about a real owner.

Start guided judge tour

Synthetic demonstration data. The public NID query below is live, but real records are never treated as evidence of noncompliance.

Choose a clean workspace or the guided judge tour to begin.
Partner waiting

Start a clean preset.

I will resolve three drawing facts first, turn the source conflict into a targeted question, and ask only what the fixture cannot answer.

Correction loop

Your corrections stay attributable.

After the first answer, revise it here. Downstream keeps both versions and updates the draft.

Reading levelNot learned yet
Detail styleNot learned yet
VocabularyNo preferences yet
Sessions remembered0
Feedback events0
Answer revisions0
Source conflicts surfaced1

Mapping safety gate

Useful enough to guide, disciplined enough to stop.

The line is a documented flow-path input. It is deliberately not drawn as an area.

Boundary withheld

No approved map was supplied. Method applicability, jurisdictional acceptance, and reference comparison are unproven. Downstream refuses to invent an extent.

Next safe action

Request an approved map or route this section to the state dam-safety office or a qualified engineer.

Public evidence

Every number and requirement has a route back.

Live query not run yet. It requests high-hazard records whose public EAP status field is null, and labels that field as unreported rather than absent.

SourceWhat it supportsBoundary
USACE National Inventory of DamsPublic inventory and live record fieldsInventory status is not structural condition or proof of compliance
FEMA P-64EAP purpose, roles, and typical contentsFederal guidance does not replace state requirements
ASDSO Emergency Action PlanningOwner collaboration and notification planningState review and emergency-manager coordination remain necessary
SIMS methodologyWhen simplified mapping may be applicableNot a substitute for engineering judgment or regulatory compliance